AstraZeneca WWTP Wuxi Project

Wuxi, China

As part of AstraZeneca Wuxi site’s development strategy, AstraZeneca Global Engineering and the Wuxi Site Team have initiated the project to build a new Wastewater Treatment Facility. This project is to build a new wastewater treatment facility to support the site’s application for strategic emerging project status, thereafter, gaining a nitrogen and phospherous (N/P) allowance for production wastewater.

AstraZeneca WWTP Wuxi Project

Client
AstraZeneca
Location
Wuxi, China
Completion
2022
Assignments
Construction Management At Risk (CMAR)
Project Scope
This project includes the new WWTP building, a 3-storey building. During the design phase, Lendlease was responsible for design management.
During construction phase, Lendlease, acting as the GC, owns the construction contracts on this project. Lendlease provides a single-point responsibility for the construction management and construction of the entire project.
Project Features
  • Safety: 100% Injury Free
  • Quality: High quality standard, met all design specifications and client expectations.
  • No unplanned interruption to production
  • Minimized tie-in shutdown impact to production